30-minute working session

See TwinWorks on your documentation

One real workflow, one design change traced through it, and a pilot scoped to prove it. No generic sales presentation.

A design change traced from the drawing, through TwinWorks, to the manual, the work instruction and the training page, each one signed off. Drawing rev B TwinWorks Manual Work instruction Training
  1. Map your workflow Source to approval
  2. Run one change Live, on your document
  3. Scope the pilot The number that has to move

Then a pilot

One document family, one programme, [6–8] weeks, one number that has to move:

e.g. Hours per change, from days to minutes

Your expert signs off every page. If the number doesn’t move, we stop.

Bring one real document and whoever approves it today.

Pick a time