Engineering change request
Should we change it?
The problem, the proposed change, the reason and its urgency.
Glossary
The process a company uses to propose, review, approve and roll out a change to a product, so that every part, drawing and document moves to the same revision.
Engineering change request
The problem, the proposed change, the reason and its urgency.
Engineering change order
The affected items, their old and new revisions, and the effectivity.
Engineering change notice
The announcement of the approved change to everyone it affects.
Every engineering change follows the same path. Step six is where most of them leak.
The engineering change process
Request: engineering, production, quality, service, a supplier or a customer raises an ECR. Assess: engineering weighs the cost, the risk and the impact on parts, tooling, stock, suppliers, certification and documentation. Approve: the change control board accepts the change, rejects it or sends it back. Release: the ECO is issued with its effectivity and the ECN goes out. Implement: PLM, ERP, production, purchasing and suppliers move to the new revision. Update the documents: manuals, work instructions, parts catalogs, training and translations follow. Verify and close: the change is checked in production and the ECO is closed.
Read the full entry on the engineering change order.
A conveyor’s idler rollers move from an open bearing to a sealed one. The ECO updates the drawing and the bill of materials. The manuals, the parts catalog and the training still show the old bearing.
When a relevant part or source changes, TwinWorks reveals the documentation it reaches through established relationships. Your experts review each page and approve a new revision; nothing is corrected or republished by itself.
Three disciplines that are often confused. Each answers a different question.
| Criterion | Engineering change management | Configuration management | Document control |
|---|---|---|---|
| Question it answers | How is a change to the product proposed, approved and released? | What exactly is built, in which version, for each unit? | Which version of each controlled document is current, and who approved it? |
| What it controls | Parts, assemblies, drawings and bill-of-materials revisions | Baselines, configurations and serial effectivity | Procedures, manuals, forms and records |
| Usual owner | Engineering and the change board | Configuration management or the program office | Quality |
| Usual tools | PLM and ERP change modules | PLM and configuration databases | Document management and quality systems |
Engineering change management is the process a company uses to propose, assess, approve and roll out changes to a product. A change starts as an engineering change request (ECR), is approved by a change control board, is released as an engineering change order (ECO) with its effectivity, and is announced to everyone affected with an engineering change notice (ECN). Parts, drawings, the bill of materials and, finally, the documentation then move to the new revision.
The ECR proposes a change and asks whether to make it. The ECO is the approved instruction that says exactly what changes and from when. The ECN announces the approved change to production, purchasing, service, documentation and suppliers.
A change control board (CCB) is the group that reviews each engineering change request and approves, rejects or returns it. It usually brings together engineering, quality, production, purchasing and, for regulated products, certification.
Effectivity is the point from which a change applies: a serial number, a date, a production lot or a configuration. Units built before it keep the old revision, so their manuals and spare parts must stay available.
Start from the released ECO, run a where-used for each changed part or source across manuals, work instructions, parts catalogs and training, give each affected document an owner, and approve a new revision of each one. Documentation software such as TwinWorks can identify affected content through established relationships; experts still review and approve every update.